Inside the new building, a flexible rack system will be installed, providing an additional 5,000 pallet spaces. This will make open air storage spaces obsolete in future. As a result, the Gumpoldskirchen site will further strengthen its significant role for the Gabriel-Chemie Group, especially in the field of supply chain and logistics. Additionally, the building will be equipped with a photovoltaic system contributing an additional 320 kWp to the existing 881 kWp installation.
"This warehouse extension, requiring an investment of €7.0 million, underscores our commitment to further strengthen Gabriel-Chemie's position as a future-oriented masterbatch manufacturer."